CHRONOLOGY OF MAIN WORKS |
|
No. |
YEAR |
CONTRACT |
PROJECT |
PROJECT LOCATION |
|
132 |
2012 |
REFINERÍA DEL
PACIFICO ELOY ALFARO RDP |
PREPARATION WORKS
OF THE IMPLANTATION AREA OF "REFINERIA DEL PACIFICO" PROJECT LOCATED
IN THE MANABI PROVINCE, REPUBLIC OF ECUADOR |
MANTA -
MANABÍ |
|
131 |
|
METROPOLITAN
PUBLIC COMPANY MOBILITY AND PUBLIC WORKS |
CONSTRUCTION OF
THE ROAD OF INTEGRATION OF THE VALLEYS "RUTA VIVA" - PHASE I -
LOCATED IN SIMON BOLIVAR AVENUE, SAN JUAN SECTOR, AND LA PRIMAVERA |
QUITO, PICHINCHA |
|
130 |
|
TECPETROL - COMINTRAC S.A. |
TOPOGRAPHY AND
POSITIONING OF GPS POINTS ON 10 PLATFORMS OF THE WELLS LOCATED AT
THE SHUSHUFINDI CAMP |
CAMPO
SHUSHUFINDI |
|
129 |
2011 |
TECPETROL - TECPECUADOR S.A. |
ACCESS ROAD AND
PLATFORM CONSTRUCTION BERMEJO EAST X-1 |
CAMPO
BERMEJO |
|
128 |
|
MINISTRY OF
TRANSPORTATION AND PUBLIC WORKS |
COMPLEMENTARY
CONTRACT OF THE CONSTRUCTION, IMPROVEMENT AND MAINTENANCE OF THE
VARIANT LIMON – PLAN DE MILAGRO ROAD OF 10,65 KM LENGTH.
INCLUIDING THE
CONSTRUCTION OF THE BRIDGES:
YUNGANTZA RIVER 1
OF 40 M.
PROGRESO RIVER OF
28 M.
CRUZADO RIVER OF
25 M.
YUNGANTZA 2 OF 60
M WITH METAL BEAMS. |
MORONA SANTIAGO |
|
127 |
|
PRIVATE PROJECTS |
CONSTRUCTION OF
REAL ESTATE PROJECTS |
QUITO, PICHINCHA |
|
126 |
|
CONSTRUCTORA HIDROBO ESTRADA S.A. |
CONSTRUCTION OF
"SAN IGNACIO" BUILDING: 6 FLOORS AND 1 SUBLEVEL.
6000 M2. OF
CONSTRUCTION, 33 APARTMENTS, 55 COVERED PARKING, 33 WAREHOUSES,
LOCATED IN ATAHUALPA AVE. BETWEEN AMAZONAS AND 10 DE AGOSTO AVE., LA
CAROLINA. |
QUITO, PICHINCHA |
|
125 |
2009-2011 |
CONSTRUCTORA
HIDROBO ESTRADA S.A. |
CONSTRUCTION OF "GAVÀ" BUILDING: 13 FLOORS AND 3 SUBLEVELS.
6000 M2.
OF CONSTRUCTION, SUITES AND APARTMENTS, LOCATED IN ATAHUALPA AVE. BETWEEN
AMAZONAS AND 10 DE AGOSTO AVE., LA CAROLINA. |
QUITO, PICHINCHA |
|
124 |
2010 |
MINISTRY OF
TRANSPORTATION AND PUBLIC WORKS |
CHANGE ORDER BY
INCREASING AMOUNTS OF THE CONSTRUCTION AND MAINTENANCE GUANUJO –
ECHEANDIA ROAD, WITH 53,29 KM LENGTH.
BRIDGE "SALINAS"
28 M. LENGTH, BRIDGE "CHARQUIYACU" 16 M. LENGTH |
BOLÍVAR |
|
123 |
|
MINISTRY OF
TRANSPORTATION AND PUBLIC WORKS |
COMPLEMENTARY
CONTRACT OF THE REHABILITATION AND MAINTENANCE OF THE VELACRUZ -
CHAGUARPAMBA - RIO PINDO ROAD, 62.50 KM. LENGTH AND ACCESS TO OLMEDO
OF 5,40 KM LENGTH AND CONNECTION BETWEEN OLMEDO AND CHAGUARPAMBA.
BRIDGES: "LA
ESPERANZA" RAVINE 30 M. LENGTH, "CHIPIANGA" RAVINE 50 M. LENGTH AND
"BUENA VISTA" BRIDGE READAPTATION
|
LOJA |
|
122 |
2009 |
MINISTRY OF
TRANSPORTATION AND PUBLIC WORKS |
CHANGE ORDER BY
INCREASING TERM AND CHANGE OF CONSTRUCTION DESIGN AND MAINTENANCE OF
VARIANT LIMON – PLAN DE MILAGRO ROAD 10,65 KM LENGTH.
BRIDGE "YUNGANTZA
1" 40 M. LENGTH, BRIDGE "YUNGANTZA 2" 30 M. LENGTH, BRIDGE OVER
"PROGRESO" RIVER 28 M LENGTH, BRIDGE OVER "CRUZADO" RIVER 25 M.
LENGHT, BRIDGE "WITHOUT NAME" RAVINE 30 M. LENGHT. |
MORONA SANTIAGO |
|
121 |
|
MINISTRY OF
TRANSPORTATION AND PUBLIC WORKS |
CHANGE ORDER BY
INCREASING AMOUNTS AND TERM, RECONSTRUCTION AND MAINTENANCE OF PLAN
DE MILAGRO – INDANZA – GUALAQUIZA ROAD, NO. 3 SECTION: PLAN DE
MILAGRO – SAN JUAN BOSCO WITH 25 KM LENGTH. |
MORONA SANTIAGO |
|
120 |
2008 |
MINISTRY OF
TRANSPORTATION AND PUBLIC WORKS |
RECTIFICATION,
IMPROVEMENT AND MAINTENANCE OF VARIANT LIMON - PLAN DE MILAGRO ROAD,
10.65 KM. LENGTH.
BRIDGE "YUNGANTZA 1" 40 M. LENGTH,
BRIDGE "YUNGANTZA 2" 30 M. LENGTH, BRIDGE OVER "PROGRESO" RIVER 28 M
LENGTH, BRIDGE OVER "CRUZADO" RIVER 25 M. LENGHT, BRIDGE "WITHOUT
NAME" RAVINE 30 M. LENGHT. |
MORONA SANTIAGO |
|
119 |
|
MINISTRY OF
TRANSPORTATION AND PUBLIC WORKS |
CONSTRUCTION
AND MAINTENCE OF THE GUANUJO - ECHEANDIA ROAD,
53.29 KM. LENGTH.
BRIDGE "SALINAS"
28 M. LENGTH, BRIDGE "CHARQUIYACU" 16 M. LENGTH |
BOLIVAR |
|
118 |
|
MINISTRY OF
TRANSPORTATION AND PUBLIC WORKS |
REHABILITATION
AND MAINTENCE OF THE VELACRUZ - CHAGUARPAMBA - RIO PINDO ROAD,
62.50 KM. LENGTH AND CONNETION BETWEEN OLMEDO AND CHAGUARPAMBA.
BRIDGES: "LA ESPERANZA" RAVINE 30 M. LENGTH, "CHIPIANGA" RAVINE 50 M. LENGTH AND "BUENA VISTA" READAPTATION |
LOJA |
|
117 |
|
TRIOLO - ITALIA S.R.L. |
SIGCHOS
HIDROELECTRIC PROJECT CONSTRUCTION |
SIGCHOS, COTOPAXI |
|
116 |
|
TECPETROL - TECPECUADOR S.A. |
CONSTRUCTION 2.8
KM OF TRACK AND PAD A PLATFORM OF 100X100 M., WALLS, GABION WALLS,
REVEGETATION, API TRANSPORT OF FATS. |
CAMPO BERMEJO |
|
115 |
2007 |
PETROLEUM
CONSORTIUM BLOCK 18 OPERATED BY PETROBRAS |
SLOPE REBUILT AND DITCHES CONSTRUCTION FOR THE ACCESS ROAD TO PATA
3 |
BLOCK 18 |
|
114 |
|
PETROLEUM
CONSORTIUM BLOCK 18 OPERATED BY PETROBRAS |
CLOSURE OF POOLS IN THE BLOCK 18. TAMPONADE WITH CLAY, PLACEMENT OF
GEOTEXTILES AND GRAVEL FOR 18 POOLS WITH A CAPACITY OF APPROXIMATELY
108100 BBL. |
BLOCK 18 |
|
113 |
|
SIPEC SOCIEDAD INTERNACIONAL PETROLERA |
ADITIONAL WORKS
MDC PROJECT. CONSTRUCTION OF THE CONCRETE BASE FOR WATER TREATMENT
PLANT PRODUCTION, FLOTATION CELL AND CLEANER.
CONSTRUCTION OF THE BASE FOR THE HPS PUMP FOR WATER REINYECTION
C.P.F. |
BLOCK MDC |
|
112 |
|
PETROLEUM
CONSORTIUM BLOCK 18 OPERATED BY PETROBRAS |
INSTALLATION AND
REPAIR OF THE PERIMETRAL FENCE IN BLOCK 18.
WALLS
BARBED WIRE, CYCLONE GALVANIZED SCREEN, CONCRETE POSTS AND
GALVANIZED IRON POSTS.
|
BLOCK 18 |
|
111 |
|
PETROLEUM
CONSORTIUM BLOCK 14 OPERATED BY PETROORIENTAL S. A. |
MUD PITS
REMEDIATION IN THE CDP. EXCAVATION AND SLUDGE TRANSFER, COVERING
POOLS WITH CLAY, BALLAST AND REVEGATATION OF THE ZONE. |
BLOCK 14 |
|
110 |
|
MINISTRY OF
TRANSPORTATION AND PUBLIC WORKS |
RECONSTRUCTION AND
MANTEINANCE OF SANTO DOMINGO - LOS BANCOS ROAD. SECTION: SANTO
DOMINGO - 10 DE AGOSTO OF 34.20 Km. OF LENGHT. |
SANTO DOMINGO DE LOS
COLORADOS |
|
109 |
|
CBMI CONSTRUCTION CO. LTD. / LAFARGE CEMENTOS S.A. |
ENLARGEMENT OF
LAFARGE CEMENTOS S.A. - SELVALEGRE CONCRET PLANT |
OTAVALO, IMBABURA |
|
108 |
2006 |
URCISOL S.A. |
CONSTRUCTION OF 1.605 LOTS FOR CIUDAD DEL SOL URBANIZATION. SEWAGE
SYSTEM, DRINKING WATER, POWER ELECTRICAL NETWORK, TELEPHONIC
COMMUNICATIONS NETWORK, GREEN AREAS WITH MULTI SPORTS FIELDS,
CONTROLLED ACCESS. IN A TOTAL AREA TO URBANIZE OF 36.35
HA. |
PICHINCHA |
|
107 |
|
PETROLEUM CONSORTIUM BLOCK 17 OPERATED BY PETROORIENTAL S.A. |
CONSTRUCTION OF CIVIL, ELECTRICAL, AND MECHANICAL WORKS FOR THE
STANDARDIZATION OF PLATFORMS IN BLOCK 17, AUCA CAMP AND PINDO. |
BLOCK 17 |
|
106 |
|
ANDES PETROLEUM LTD. |
MAINTENANCE OF MAIN AND SECONDARY ROADS IN BLOCKS 14 AND 17
PETROLEUM CONSORTIUM, OPERATED BY PETROORIENTAL S.A. |
BLOCK 14, BLOCK 17 & SHIRIPUNO |
|
105 |
|
PERENCO ECUADOR LIMITED |
CONSTRUCTION OF WELL PLATFORM AND ACCESS ROAD FOR PAD D, YURALPA |
BLOCK 21 |
|
104 |
2005 |
MINISTRY OF PUBLIC WORKS AND COMMUNICATIONS |
RECONSTRUCTION AND MAINTENANCE OF THE PLAN DE
MILAGRO-INDANZA-GUALAQUIZA ROAD, SECTION Nº 3 PLAN DE MILAGRO-SAN
JUAN BOSCO, 25 KM. |
MORONA SANTIAGO |
|
103 |
|
PERENCO ECUADOR LIMITED |
CONSTRUCTION OF WELL PLATFORM AND ACCESS ROAD FOR PAD G, YURALPA |
BLOCK 21 |
|
102 |
|
CITY ORIENTE LTD. |
CONSTRUCTION OF WELL PLATFORM WITH ACCESS ROAD, TIPISHCA C |
BLOCK 27 |
|
101 |
|
OCCIDENTAL EXPLORATION AND PRODUCTION COMPANY |
DESIGN AND CONSTRUCTION OF WELL PADS IN WEST PALMAR, EAST PALMAR,
EAST PALMAR B & EAST PALMAR C |
BLOCK 15 |
|
100 |
|
CITY
ORIENTE LTD. |
EXTENSION OF EPF PLATFORM |
BLOCK 27 |
|
99 |
|
ENCANECUADOR S.A. |
CONSTRUCTION OF ACCESS ROAD AND PLATFORM EXTENSION FOR PENKE B
|
BLOCKS 14, 17 & SHIRIPUNO |
|
98 |
|
PERENCO ECUADOR LIMITED |
CONSTRUCTION OF WELL PAD F FOR PERFORATION OF WELLS F |
BLOCK 21 |
|
97 |
|
AEC
ECUADOR LTD. |
CIVIL CONSTRUCTIONS 18B20 |
TARAPOA BLOCK |
|
96 |
|
CITY ORIENTE LTD. |
GEOTECHNIC INVESTIGATION AND CIVIL WORKS FOR TWO 10,000 BBL
TANKS |
BLOCK TARAPOA |
|
95 |
|
SIPEC
SOCIEDAD INTERNACIONAL PETROLERA |
COUNTERWELL AND 22 WELL CONSTRUCTION |
BLOCKS 27, EPF |
|
94 |
|
PERENCO ECUADOR LIMITED |
CONSTRUCTION OF 4 CUTTING PITS, TRANSPORTATION OF PERFORATION
MATERIALS, MIX AND LAYOUT OF CUTTING PITS |
BLOCK 21 |
|
93 |
|
PERENCO ECUADOR LIMITED |
ROAD MAINTENANCE |
BLOCK 21 |
|
92 |
|
CITY ORIENTE LTD |
SEWING SYSTEM FOR "BATALLON DE SELVA 55" |
BLOCK 27 |
|
91 |
|
ENCANECUADOR S.A. |
SUNKA 2 ACCESS ROAD REPAIR |
BLOCKS 14, 17 & SHIRIPUNO |
|
90 |
2004 |
CITY ORIENTE LTD. |
CONSTRUCTION OF MESH FENCE FOR "BATALLON DE SELVA
55" |
BLOCK 27 |
|
89 |
|
SIPEC
SOCIEDAD INTERNACIONAL PETROLERA |
ROAD MAINTENANCE SIPEC CAMP |
BLOCKS PARAISO, PBH & MDC |
|
88 |
|
SIPEC
SOCIEDAD INTERNACIONAL PETROLERA |
PLATFORM EXTENSION MDC 01 - MDC 04 |
BLOCK MDC |
|
87 |
|
AEC
ECUADOR LTD. |
CIVIL WORKS AND CONSTRUCTIONS IN FANNY
GENERATION |
BLOCK TARAPOA |
|
86 |
|
SIPEC
SOCIEDAD INTERNACIONAL PETROLERA |
OFFICE AND BATHROOM CONSTRUCTION, CELLAR FENCE CONSTRUCTION
FOR SITE MATERIALS |
SIPEC BASE CAMP COCA |
|
85 |
|
ENCANECUADOR S.A. |
CONSTRUCTION OF NANTU E PLATFORM AND ACCESS
ROAD |
BLOCKS 14, 17 & SHIRIPUNO |
|
84 |
|
ENCANECUADOR S.A. |
ACCESS ROAD AND PLATFORM CONSTRUCTION HORMIGUERO SUR AND ROAD
TO TIGUANO |
BLOCKS 14, 17 & SHIRIPUNO |
|
83 |
2 |
AEC
ECUADOR LTD. |
CIVIL CONSTRUCTIONS IN SONIA B PLATFORM |
BLOCK TARAPOA |
|
82 |
2 |
ENCANECUADOR S.A. |
CONSTRUCTION OF ROAD BAYS |
BLOCK 14, 17 & SHIRIPUNO |
|
81 |
2 |
CITY ORIENTE LTD. |
EXTENSION OF THE PLATFORMS VINITA 1, VINITA 2 AND
BLANCA |
BLOCK 27 |
|
80 |
2 |
SIPEC
SOCIEDAD INTERNACIONAL PETROLERA |
SERVICE SUPPLY FOR CONSTRUCTION MOVEMENTS OF A PRODUCTION
STATION |
BLOCK MAURO DAVALOS CORDERO |
|
79 |
2 |
ENCANECUADOR S.A. |
MAIN AND BACK ROAD
MAINTENANCE FOR THE BLOCK ENCANECUADOR |
BLOCKS 14, 17 & SHIRIPUNO |
|
78 |
2003
|
AEC
ECUADOR LTD. |
EARTH REMOVAL FOR THE
CONSTRUCTION OF ROADS, PLATFORMS AND CUTTING PITS FOR THE
ENVIRONMENTAL MANAGMENT INTEGRAL CENTER & POOLS FOR DRILLING
DEBRIS |
BLOCK 14, 17 & SHIRIPUNO |
|
77 |
|
AEC ECUADOR LTD.& VINTAGE OIL ECUADOR
S.A. |
CONSTRUCTION OF RAOD BAYS |
BLOCK 14, 17 &
SHIRIPUNO |
|
76 |
|
AEC ECUADOR LTD. |
SUNKA 2 PLATFORM - UP GRADE |
BLOCK 14, 17 &
SHIRIPUNO |
|
75 |
|
AEC ECUADOR LTD. |
WANKE 2 PLATFORM - UP GRADE |
BLOCK 14, 17 &
SHIRIPUNO |
|
74 |
|
AEC ECUADOR LTD. VINTAGE OIL ECUADOR
S.A. |
CONSTRUCTION OF HORMIGUERO D PLATFORM AND ACCESS
ROAD |
BLOCK 14, 17 &
SHIRIPUNO |
|
73 |
|
AEC
ECUADOR LTD. |
CONSTRUCTION OF THE ROAD ACCESS AND ALICE
PLATFORM |
BLOCK TARAPOA |
|
72 |
2 |
AEC
ECUADOR LTD. & VINTAGE |
HORMIGUERO C WELL PAD EXPANSION |
BLOCK 14,17 & SHIRIPUNO |
|
71 |
2 |
AEC
ECUADOR LTD. |
18B50 WELL PAD EXTENSION |
BLOCK TARAPOA |
|
70 |
2 |
MINISTERIO DE OBRAS PUBLICAS Y COMUNICACIONES |
RECONSTRUCTION OF "LA TRONCAL AMAZONICA" E-45, PUYO-MACAS
ROAD, IN PASTAZA AND MORONA SANTIAGO. SECTION PASTAZA-MACAS
|
PASTAZA AND MORONA SANTIAGO |
|
69 |
2002 |
MINISTERIO DE OBRAS PUBLICAS Y COMUNICACIONES |
71 KM GUARANDA-BILOVAN-BALZAPAMBA HIGHWAY MAINTENANCE IN
BOLIVAR AND LOS RIOS |
BOLIVAR & LOS RIOS |
|
68 |
2 |
AEC
ECUADOR LTD. |
CONSTRUCTION OF SHIRLEY B PLATFORM AND ACCESS
ROAD |
BLOCK TARAPOA |
|
67 |
2 |
VINTAGE OIL ECUADOR |
CONSTRUCTION OF PLATFORMS WANKE 2 AND NANTU 3 AND ACCESS
ROADS |
BLOCK 14 , 17 & SHYRIPUNO |
|
66 |
2 |
VINTAGE OIL ECUADOR & ENCANECUADOR |
MAINTENANCE OF THE PINDO-PRODUCTION CENTER ROAD, CAMPO BASE
ACCESS ROAD CONSTRUCTION AND OTHERS |
BLOCK 14 , 17 & SHYRIPUNO |
|
65 |
2 |
MINISTERIO DE OBRAS PUBLICAS Y COMUNICACIONES |
MAINTENANCE OF SAN CLEMENTE'S Y - KM 8 (BAHIA) -
TOSAGUA |
MANABI |
|
64 |
2001 |
AGIP OIL ECUADOR B.V. |
CONSTRUCTION OF THE HELIPORTABLE PLATFORMS AND WELL PADS
VILLANO NORTE AND VILLANO B |
BLOCK 10 |
|
63 |
- |
CONSTRUCTORA NACIONAL, C.A. & MOP |
NEW ROAD NUEVA LOJA (LAGO AGRIO)-SIMON BOLIVAR UPGRADE
|
SUCUMBIOS |
|
62 |
- |
CAYMAN INTERNATIONAL EXPLORATION COMPANY |
ANNUAL ROAD MAINTAINANCE OF THE SECTION "Y DE
PUCUNA-COOPERATIVA 25 DE DICIEMBRE" |
BLOCK 18 |
|
61 |
- |
PETROCOL, PETROLEOS COLOMBIANOS LTD. |
TIGUINO ROADS MAINTENANCE |
TIGUINO |
|
60 |
2000 |
VINTAGE OIL ECUADOR, S.A. |
TREATMENT, COVERING AND FINAL CLOSE UP OF COTAPINO MUD PITS
|
BLOCK 19 |
|
59 |
- |
CAYMAN INTERNATIONAL EXPLORATION COMPANY |
ROAD MANTAINANCE OF "Y DE PUCUNA-PALO AZUL 2", TREATMENT,
COVERING AND FINAL CLOSE UP OF MUD PITS PATA 2 AND PALO AZUL 2
|
BLOCK 18 |
|
58 |
- |
MINISTERIO DE OBRAS PUBLICAS Y COMUNICACIONES
|
ZHUD - COCHANCAY HIGHWAY MAINTENANCE SECTION SHUD-JAVIN, 38.5
KM |
BLOCK 27 |
|
57 |
- |
VINAGE OIL ECUADOR, S.A. |
65/8" PIPELINA REMOVAL, FROM THE KUPI 01 WELL TO THE C.D.P.
STATION |
BLOCK 14 |
|
56 |
- |
MUNICIPALITY OF SHUSHUFINDI |
GRAVEL CRUSHING AND WASHING FOR THE CONSTRUCTION OF
ARTIFICIAL SWAMPS |
SUCUMBIOS |
|
55 |
- |
CITY ORIENTE LTD. |
CONSTRUCTION OF 22.70KM ACCESS ROAD, PLATFORMS AND 8 BRIDGES
"PROJECT BLANCA" |
BLOCK 27 |
|
54 |
1999 |
CITY INVESTING COMPANY LTD. |
CONSTRUCTION OF ACCESS ROADS AND PLATFORMS IN THE FANNY AND
DORINE SECTORS : 18B40, 18B50 AND "FANNY DEEP" |
BLOCK TARAPOA |
|
53 |
- |
MINISTERIO DE OBRAS PUBLICAS Y COMUNICACIONES -
QUITO |
REHABILITATION AND MAINTENANCE OF SANTA ANA-OLMEDO 34.70 KM
HIGHWAY |
MANABI |
|
52 |
- |
CONDUTO AND ASOCIADOS & MUNICIPALITY OF MACHALA
|
PROVISION OF CRUSHED GRAVEL Ø 3/4", 3/8" Y 1 1/2", FOR
MACHALA'S & PUERTO BOLIVAR'S SANITARY SEWAING PROJECT
|
EL ORO |
|
51 |
- |
MUNICIPALITY OF MACHALA |
PROVISION AND TRANSPORTATION OF 2499 M3 OF CRUSHED GRAVEL Ø
3/8" |
EL ORO |
|
50 |
1998 |
OXY
OCCIDENTAL EXPLORATION AND PRODUCTION COMPANY |
CONTRACT TYPE FOR PROVISION OF SERVICES #M094, #L0001 AND
ROAD MAINTENANCE SERVICES AND #L0002 PROVISION OF CONSTRUCTION
EQUIPMENT |
BLOCK 15 |
|
49 |
- |
HERDOIZA CRESPO S.A. & MOP |
RECONSTRUCTION AND MAINTENANCE OF ROAD MENDEZ - MORONA: 144
KM. LENGTH |
MORONA SANTIAGO |
|
48 |
- |
CAYMAN INTERNATIONAL EXPLORATION COMPANY |
MAINTENANCE OF THE ROAD HUATARACU-SAN PABLO, CONSTRUCTION OF
ACCESS ROADS AND DRILLING PLATFORMS FOR PATA 1 AND PALO AZUL 1
EXPLORATION WELLS |
BLOCK 18 |
|
47 |
- |
TRITON ECUADOR, INC. LLC. |
MAINTENANCE OF THE HUATARACU WELL PAD ROAD |
BLOCK 19 |
|
46 |
- |
ELF
HYDROCARBURES EQUATEUR, VINTAGE & AEC |
MAINTENANCE OF PINDO-PRODUCTION CENTER ROADS, WELL PAD
ACCESS, BASE CAMP AND OTHER SERVICES |
BLOCK 14 |
|
45 |
- |
OXY
OCCIDENTAL EXPLORATION AND PRODUCTION COMPANY |
CONSTRUCTION OF THE ITAYA ROAD EXTENSION |
BLOCK 15 |
|
44 |
- |
ARCO ORIENTE, INC. |
PUYO BYPASS ROAD CONSTRUCTION & MAINTENANCE, AND
CONSTRUCTION OF 3 BRIDGES |
BLOCK 10 |
|
43 |
1997 |
OXY
OCCIDENTAL EXPLORATION AND PRODUCTION COMPANY |
ITAYA WELL PAD CONSTRUCTION |
BLOCK 15 |
|
42 |
- |
ELF
HYDROCARBURES EQUATEUR |
CONSTRUCTION OF TAPIR 1 DRILL SITE AND ACCESS ROAD
|
BLOCK 17 |
|
41 |
- |
ORYX ECUADOR ENERGY COMPANY |
MAINTENANCE OF THE ECOLOGICAL ROAD CAMPOCOCHA-CHONTAPUNTA AND
ACCESS TO THE CENTRAL YURALPA WELL PAD |
BLOCK 21 |
|
40 |
- |
MUNICIPALITY OF MACHALA |
CONSTRUCTION OF THE FIRST STAGE OF MACHALA´S AND PUERTO
BOLIVAR´S SEWING SYSTEMS |
EL ORO |
|
39 |
- |
EMPRESA METROPOLITANA DE OBRAS PUBLICAS -
QUITO |
*PROVISION AND INSTALLATION OF PAVING STONE IN BELLAVISTA -
SECTOR 2. *CONSTRUCTION OF BOULEVARD CURBS IN THE CENTRAL SECTION
LLIRA ÑAN AVE. AND *SEWAING SYSTEM FOR PUMA-PUNGO ÑAN ST. -
C.P.Q. |
PICHINCHA |
|
38 |
- |
HERDOIZA CRESPO S.A. & MOP |
RECONSTRUCTION AND MAINTENANCE OF THE ROAD MENDEZ - MORONA
(144 KM) |
MORONA SANTIAGO |
|
37 |
- |
OXY
OCCIDENTAL EXPLORATION AND PRODUCTION COMPANY |
CONSTRUCTION OF THE ACCESS ROAD TO THE ITAYA
PLATFORM |
BLOCK 15 |
|
36 |
- |
ORYX ECUADOR ENERGY COMPANY |
CONSTRUCTION OF COCA 15 PLATFORM AND ACCESS ROAD
|
BLOCK 7 |
|
35 |
- |
YPF
ECUADOR, INC. |
PROVISION AND TRANSPORTATION OF GRADED SAND & CRUSHED
GRAVEL FOR SPF, AMO C & DAIMI A |
BLOCK 16 |
|
34 |
-1996 |
ELF
HYDROCARBURES EQUATEUR |
CONSTRUCTION OF BASE CAMP PLATFORM AND ACCESS ROAD
|
BLOCK 17 |
|
33 |
- |
ORYX ECUADOR ENERGY COMPANY |
UPGRADE OF JAGUAR - MONO ROAD |
BLOCK 7 |
|
32 |
- |
CONDUTO & MAXUS |
CONSTRUCTION OF AMOC PLATFORM AND ACCESS ROAD
|
BLOCK 16 |
|
31 |
- |
MAXUS ECUADOR, INC. |
PROVISION AND TRANSPORTATION OF GRADED SAND & CRUSHED
GRAVEL FOR SPF |
BLOCK 16 |
|
30 |
- |
ELF
HYDROCARBURES EQUATEUR |
CONSTRUCTION OF NANTU 2 PLATFORM AND ACCESS ROAD
|
BLOCK 14, 17 & SHIRIPUNO |
|
29 |
- |
ELF
HYDROCARBURES EQUATEUR |
CONSTRUCTION OF HORMIGUERO 2 PLATFORM AND ACCESS
ROAD |
BLOCK 14, 17 & SHIRIPUNO |
|
28 |
- |
ELF
HYDROCARBURES EQUATEUR |
CONSTRUCTION OF SHIRIPUNO PLATFORM AND ACCESS
ROAD |
BLOCK 14, 17 & SHIRIPUNO |
|
27 |
1995 |
EMPRESA METROPOLITANA DE OBRAS PUBLICAS -
QUITO |
** CONSTRUCTION OF SEWING SYSTEM FOR AMARU ÑAN STREET -
C.P.Q. ** BUS STOP FOR TROLYBUS AND ** SEWING SYSTEM FOR THE
FIRST SECTION OF MALDONADO AVENUE |
PICHINCHA |
|
26 |
- |
ARMY FORCES OF ECUADOR |
VOLUNTARY PROVISION OF FACILITIES FOR NATIONAL ARMED FORCES
NEAR THE PERUVIAN BORDER |
AMAZONIAN REGION |
|
25 |
- |
MISANDA MINING |
CONSTRUCTION OF ACCESS ROAD TO GOLD MINES |
MORONA SANTIAGO |
|
24 |
1994 |
PLAN CIUDAD QUITUMBE - QUITO |
CONSTRUCTION OF OTOYA ÑAN AND LLIRA ÑAN
AVENUES |
PICHINCHA |
|
23 |
- |
MACOVEL C. L. & INGENIO CHOBO |
EARTH REMOVAL AND DIKE CONSTRUCTION |
GUAYAS |
|
22 |
- |
HERDOIZA CRESPO S.A. & MOP |
RECONSTRUCTION & MAINTENANCE OF THE MENDEZ-MORONA ROAD
(144 KM.) |
MORONA SANTIAGO |
|
21 |
1993 |
LATCHMOOR & MAXUS |
CONSTRUCTION OF BOGUI DRILL LOCATION |
BLOCK 16 |
|
20 |
- |
PHILLIPS S.A. - GRUPO AZUL & MAXUS |
PLATFORM CONSTRUCTIONS AND RIGHT OF WAY |
BLOCK 16 |
|
19 |
- |
PLAN CIUDAD QUITUMBE - QUITO |
*CONSTRUCTION OF LLIRA ÑAN AVE. SECTOR 6 AREA 1 *EARTH
REMOVAL: STAGE 11, 10, 09, 08 |
PICHINCHA |
|
18 |
- |
EMETEL R1 |
SOIL ANALYSIS AND ROAD DESIGN FOR ACCESS
ROADS |
PICHINCHA & ESMERALDAS |
|
17 |
- |
CONDUTO / MAXUS |
PIPELINE RIGHT OF WAY |
BLOCK 16 |
|
16 |
1992 |
INDUSTRIES EL CABUYAL LANDS |
ACCESS ROADS, RESERVOIRS AND IRRIGATION INLETS CONSTRUCTION
|
CARCHI |
|
15 |
- |
COMERCIAL HIDROBO CIA. LTDA. |
EQUIPMENT EXHIBITION AREA, OFFICES AND REPAIR SHOP
CONSTRUCTION AT QUITO,IBARRA AND TULCAN |
PICHINCHA, IMBABURA & CARCHI |
|
14 |
- |
EQUINORTE |
EQUIPMENT EXHIBITION AREA, OFFICES AND REPAIR SHOP
CONSTRUCTION AT IBARRA AND GUAYAQUIL |
IMBABURA & GUAYAS |
|
13 |
1991 |
PLAN CIUDAD QUITUMBE - QUITO |
SOIL REMOVAL - STAGE 07, 06, 05, 04 AND SUBBASE: STAGE 07, 06,
05 AND 04 |
PICHINCHA |
|
12 |
- |
MUNICIPIUM OF QUITO |
CENTRAL WASTE DISPOSAL SITES CONSTRUCTION
|
PICHINCHA |
|
11 |
1990 |
LATCHMOOR & ELF |
HELI-TRANSPORTABLE SUPPORTTED CONSTRUCTION OF WELL PADS -
AWANT 1, KINTIA 1 AND WANKE 1 |
BLOCKS 14 & 17 |
|
10 |
-1989 |
PROVINCIAL GOVERNMENT OF PASTAZA |
COMPLETION OF THE PUYO-SINGUIN-RIO PASTAZA HIGHWAY &
CONSTRUCTION OF THE KM51 HIGHWAY VIA NAPO-ALTO PUNIN
|
PASTAZA |
|
9 |
1988 |
MINISTERIO DE OBRAS PUBLICAS Y COMUNICACIONES DEL
ECUADOR |
RECONSTRUCTION OF THE HIGHWAY
BAEZA-ARCHIDONA-TENA |
NAPO |
|
8 |
- |
HERDOIZA CRESPO S.A. & MOP |
CONSTRUCTION OF THE HIGHWAY EL TOPO-EL TRIUNFO-LOS
LLANGANATES |
TUNGURAHUA |
|
7 |
1987 |
HERDOIZA CRESPO S.A. & MOP |
RECONSTRUCTION OF THE HIGHWAY CHONE-FLAVIO
ALFARO-LA CRESPA |
MANABI |
|
6 |
- |
PROVINCIAL GOVERNMENT OF AZUAY |
CONSTRUCTION OF THE ROAD SAN FERNANDO-TURUPAMBA-CACHI
|
AZUAY |
|
5 |
1986 |
I E
T E L |
CONSTRUCTION OF THE SANTO DOMINGO DE LOS COLORADOS' TELEPHONE
CENTRAL |
PICHINCHA |
|
4 |
-1985 |
HERDOIZA CRESPO S.A. & PROVINCIAL GOVERNMENT OF PICHINCHA
|
CONSTRUCTION OF LOS BANCOS - LAS MERCEDES SECONDARY ROAD
(40KM) |
PICHINCHA |
|
3 |
- |
MUNICIPALITY OF QUIJOS |
CONSTRUCTION OF SEWING SYSTEM,PARKS AND COMMUNAL HOUSES FOR
THE COMMUNITIES OF BORJA, SANTA ROSA AND REVENTADOR |
NAPO |
|
2 |
- |
PROVINCIAL GOVERNMENT OF PICHINCHA |
EXTENSION OF THE SCHOOLS NELSON TORRES AND
MALCHINGUI |
PICHINCHA |
|
1 |
- |
S.O.S. KINDER VILLAGE |
INFANT VILLAGE YAHUARCOCHA |
IMBABURA |